A £1 million project to repair four of Bournemouth’s groynes at Solent beach and Boscombe beach
Lead Authority
Bournemouth Borough Council
Main Contractor
Budget
£1 million
Start date
November 2009
Project completed
February 2010
Groyne Nos 51 & 52 at Solent beach, Southbourne
Damaged timber sections at the seaward end of the 35-year old non-standard permeable timber groynes were replaced with Portland stone rock armour.
The £800,000 cost of this work was 100% Grant Aid funded by Defra through the Environment Agency.
Groyne 52 at Solent beach, March 2023. Photo © Colin Smith (cc-by-sa/2.0)
Groyne Nos 18 & 19 at Boscombe beach
The damaged pre-cast concrete sections at the seaward end of the 40-year old groynes were replaced with Portland stone rock armour.
The £250,000 cost of this work was 100% Grant Aid funded by Defra through the Environment Agency.
Bournemouth’s first groynes were built in 1915, after seawall construction began in 1907. A field of 48 concrete
groynes were in place by 1969, but all had been removed except for these final two. Concrete groynes had a long life, but were very difficult to maintain. The groynes were typically short and to a low profile. By 2009 Groynes 18 & 19 had started to fail at the seaward end and required repair.